Thursday, 1 March 2018

Grand Laker nearly done

Getting close to the water, we'll beat spring and be waiting. Almost done and ready

Grinding away loose fibreglass for patch with epoxy and glass , the last bit of damage done when the

Starting the sanding for new paint

Patch over both sides of stem

Half way there

Feathering in with fairing compound

Taped off for paint

Ready for Grand Lake Green

First coat done

Second coat of new varnish inside

Seat and spray rails left to do

6hp for looks

Will be replaced with a 9.8

Rails in place for fitting

Ash rails epoxy sealed and varnished

Evinrude 9.8 in place on transom on a Laker

Unit on trailer ready for water - next is the trailer rebuild