Thursday 1 March 2018

Grand Laker nearly done

Getting close to the water, we'll beat spring and be waiting. Almost done and ready


Grinding away loose fibreglass for patch with epoxy and glass , the last bit of damage done when the


Starting the sanding for new paint

Patch over both sides of stem


Half way there
 

Feathering in with fairing compound



Taped off for paint

Ready for Grand Lake Green




First coat done


Second coat of new varnish inside


Seat and spray rails left to do

6hp for looks

Will be replaced with a 9.8

Rails in place for fitting

Ash rails epoxy sealed and varnished

Evinrude 9.8 in place on transom on a Laker

Unit on trailer ready for water - next is the trailer rebuild