Showing posts with label kingplank. Show all posts
Showing posts with label kingplank. Show all posts

Saturday, 5 April 2014

Peterborough Comet restoration - or 'wow do i ever hate blue paint'


This stunning 1920s Peterborough Comet was sent to us for a complete restoration. This one is the more rare arch deck model, rather than the angular front deck as on boats such as those built by Walter Dean, among others.


Boat is showing its age at close to 90 years old, and had one of the hardest coats of blue paint. Must have been all that lead!


Stripping was slow, but steady. The boat had been painted white outside, and the owners had stripped most of it off. However, it was impossible to get it all off the hull, and more aggressive stripping or sanding would have damaged the hull. Remnants of paint become part of the boats history, especially as family members recount the boats history over several generations.


All stripped, and starting to oil after bleaching. 


Butternut stripe. Accent stripes were usual on many cedarstrips. 


Heavy copper nails clenched over on elm ribs




Front deck beams, onto which the decks of alternating strips of butternut and cedar were fastened with iron nails. This model was finished in butternut, with seat bars, seat frames, decks, removable thwart and gunwales all made of this light and pretty wood. 


Varnish going on


New locker door to replace missing one. These models had a locking door so paddles could be left with the boat and not disappear. Handle end goes in bow locker, and hasp gets padlocked. 



Nearly done. 


Getting its shine on. For some reason we never took a shot of the convertible seats, but they fold down into a near vertical position to function as a back rest when sitting on the floor of the canoe






New coamings, seats and kingplank. The new wood will eventually oxidize to more closely resemble the original wood. 


More coats of varnish


More yet. Cherry stands made for the owner to store and display their heirloom. 




Handing off to the owner. She had many memories of this boat and her husband and family over the years, and approaching 90 was looking forward to a paddle in it, as it had not been sea worthy for decades. 


New butternut floor racks in place. 


Another one done!












Thursday, 27 December 2012

16/30 Build, Clayton NY 2007


In March of 2007, I participated in the first build of the hard chine 16\30 sailing canoe at the Antique Boat Museum in Clayton, NY. Then curator John Summers had documented a surviving example and developed the boat for modern stitch and glue construction. I had been corresponding with him on the first sailing canoe I had collected, and he offered me the opportunity to build a new 16/30; I sent my deposit immediately. 

Below is a shot of the fleet of these boats built by Fred Gilbert in Brockville. The boats constituted a sort of One Design for members of the canoe club to race against one another.
Photo courtesy of Dragonfly Canoe
Below is a fantastic post card of  the Gananoque Canoe Club in the Thousand Islands area of Eastern Ontario, which saw much sailing canoe development, racing and general use. On the dock is one of the hard chined 16/30s. John Summers graciously shared this image he discovered.

Courtesy John Summers


On arriving at the ABM to begin construction, John had by this time completed the major work on the first hull, which was on site to provide inspiration as well as act as a reference point during construction. Awaiting paint and sails, it was ready to go.


My own hull, September 2007, 7 months later at the Killbear Paddlers Rendezvous. Having been sailed previously at the ABM boat show in August, it was now time for me to get on the learning curve.
The ABM workshop was wonderfully equipped, large and warm for boatbuilding in March. Day one saw the stitching of plywood panels begin immediately after brief introductions and a run down of the impending schedule.
Quickly the shape went from floppy banana to boat hull with the addition of the sides.


With stitch and glue construction the boat derives it shape and rigidity from bulkheads rather than traditional framing. Ulitmately it provides a hull that is much more stiff and maintenance free.


Once the hull is trued up it needs the seams filleted and fiberglass taped, which strengthen and lock the shape in place. 
The boat takes shape
Fillets visible.
A nice shot of the Kingplank, in which are located the mizzen mast tube, along with the post for the norwegian tiller, which is peculiar to these boats. 



Along with bulkheads and taped seams, the hull is covered in  a layer of fiberglass cloth saturated and filled with epoxy. 
Gunwales and doublers in place on the rear bulkheads, the front has been notched out and is waiting for kingplank and mast tube.

The happy day when the sails arrived. For the first time we realized what 90sq ft of sail spread on two masts looks like on such a narrow hull! 
Cockpit floor, and centerboard trunk in place. Hull is self draining through slot with floors angled down to center



Difficult to interpret Johns expression here. I would like to say approval, but disbelief seems more likely. All boats progressed at roughly the same rate, and are ready for decking after being sealed with epoxy once more internally.


Ready for the ride home, with decking secured  but not installed. My plan was for a bright finished top, and painted hull as would not have been out of place on a period boat. 



The finished product, ready for sailing. The boat turned out wonderfully, and its a safe bet that there wont be any others at the majority of boat shows.





30th WCHA assembly at Keuka Lake NY, where the theme was sailing canoes. 
four 16/30s showed up, all but one from the first building course. 

Likely the largest gathering of sailing canoes in many decades.

 Equipment failures happen, whether new or antique. A broken spar disabled this one, all a part of using and racing boats.


A calm moment on Keuka Lake, in the finger lakes region of NY.