Showing posts with label pine. Show all posts
Showing posts with label pine. Show all posts

Friday, 30 December 2016

New Wanigan in old Pine

Time to drag out the form and put one together for the Gr8 homeroom teacher. Good teachers just make you want to build...


Leftover big pine from what was used to plank the form. A really kool piece was kept for the lid



Old pine sides, white cedar ribs and western red cedar planking



Making the turn around the bottom


Planked and ready to lift from the form. 


Finished, sanded and ready for tung oil


That satisfying moment when the oil hits the sanded wood


Oiled inside and out, 3 coats rubbed and paste furniture wax rather than varnish


The apprentice oiling the lid next


Walnut, pine and WRC


Second coat of oil soaking in


Ready for furniture wax


The lid, complete with blue staining from Pine Wilt disease,
more here:

  • Pine wilt is a lethal disease caused by a native nematode (Bursaphelenchus xylophilus), vectored to trees by a wood borer insect–the pine sawyer beetle (Monochamus spp.).
  • Rapid change in needle color from green to gray-green to brown or light tan, beginning in late summer
  • Wood from recently affected trees is very dry, brittle and lacks any resin accumulation when cut. No evidence of exit holes, sawdust, or pitch tubes associated with bark beetles or wood borers in branches or the trunk
  • The wood is discolored by blue stain fungi
  • The blue stain fungusGrosmannia clavigera, is a species of sac fungus. It spreads to lodgepole pineponderosa pineDouglas-fir, and whitebark pine trees from the body and a special structure in the heads of mountain pine beetles. The blue stain fungus has evolved a relationship with mountain pine beetles that allow them to travel from tree to tree on a special structure in the beetle’s heads and stops the tree from producing resin to pitch out or kill the beetle, encouraging the pine beetle infestation
  • The blue stain fungus spores germinate and produce a thread like mass (mycelium) that colonizes the phloem and sapwood. Fungal spores are usually blown away by wind but blue-stain spores are "sticky." This process eventually blocks the nutrient-conducting columns of the tree draining the trees of their nutrients eventually causing the tree to starve to death.[4] The symptoms and signs of blue stain fungus are a blue-gray discoloration of sapwood in wedge shapes of recently killed trees

Saturday, 27 June 2015

Pine Wanigan

Some of the last of the pine used to strip the building form, almost clear and 18" wide and 18' long, a nice find that had been cut years ago and bought up in Muskoka. Grade 6 teacher went above and beyond to make a real difference in our sons education, helping him reach his full potential. The form was dusted off and a wanigan built. Forgot to snap a picture of it completed with the rope handles, it came out nice. White cedar ribs (what else?) and red cedar planking, with inner and outer rails of American Chestnut, left over from paddle offcuts. 


 Complete, waiting for finish


Other side


First coat of tung oil


Soaking in fast


Colour coming up nicely



Helping out


Focus out front, sailing canoes in the background



Waiting on varnish



First coat, 4 more and it was presented. 



Thursday, 2 October 2014

Pre-fire Cruiser form progress


Material gathering took a different tack this time around. Rather than the 18', 18" wide clear old growth pine we bought for stripping the form, the stations began with repurposed plywood. Kijiji provided a seller with 25"x36" , 3/4" ply sheets for $1 each. $20 for enough and some left over is a great deal, and as its older ply the veneers are actually nice and tight, with few voids. Things really were better in the old days! Well, at least the trees were bigger.... Apparently they had been headboards at a women's shelter, hence the varnish on one side. Having served a noble cause, seems a fitting end they become our form. 
Here they are roughed out. 



Paired up since the canoe is of course symmetrical - single centre station. 


Lots and lots of scrap.



More scrap


Sanded and faired, almost done


Full set, next to reduce them since the lines are taken on the outside of the boat. Need to remove material for canvas, planking, ribs, metal on form, and sheathing (strips) on the form. Close to 1.5" all together 



All the scrap from 15 stations. Burn baby burn.



Keep that dust down. Essential equipment.....


One other essential. Dont know why the photo flipped, try to fix it later. 


Next up, backbone and mounting  and ends, before stripping and metal bands. 
Also need to build stem form.
Stay tuned....



LVL for backbone, nice and straight and rigid, no need to make a box beam.


Getting anxious!


Lots of tumblehome evident in the early designs. 


Reduction lines for form and boat material


More cutting and sanding before mounting and stripping. 
Stems and stem forms next

Back to our lines for the bow section ahead of station #3. 


Our repurposed plywood fell short of our needs by 1.5" overall and 1" in height. Off to the store tomorrow to buy a half sheet of 3/4" ply.  Once its cut out, it will be reduced for the canvas , planking along the flat surface,  and stem thickness. 

Better fit


GIS or good one side, nice to draw on and generally better quality, even if its for building houses and not boats....


Sheet will produce both ends, and one side of stem form


Ends cut and screwed together waiting to be sanded


One half of stem form, to be reduced and cleats added. 

Work on the cruiser form was halted for work on a concrete form. Long story short the adjoining property had been renovated prior to ours and the neighbours purchase and the grade altered to dump rain and melt water on our property. 


No more water in the garage in spring, a sidewalk is next and along with the retaining wall will divert water to the front of the property where it should go. 


A different kind of form...


Weapon of choice.


Woodworking tools gave way to landscaping tools. 
Just the sidewalk pour is left, then back to the form!
 A new Cruiser for spring/summer!!!


Outside work is done, just in time for the snow that keeps trying to accumulate. Back inside, first step is to cleat the LVL in preparation for stations. Rob is always willing to lend the third hand and sometimes even brings donuts. 



Ready for stations



Starting at the centre and working out, truing and checking. 


End of a great day's progress. Trued, fit and stood off. 


Just waiting for ends. 


Trued up, a spool of dacron bow string provides a good reference line. 


Clamped and predrilled once set. 


Squared and blocked off. 


First end on. 


Next is trim LVL end so gunwale backers will clear, and set the end cleats after the backers are pre bent. 


Sweet shape! Looks like we got the lofting right. 



Next up is the other end.


Another long view. 


When both ends are on and gunwale backer set, stations need to be doubled and ready for stripping before steel clench bands can go on. 
Its coming along!!

Bracing all in place, and form is rigid. 


Next is covering it with strips of pine, fairing and steel bands. Gunwhale backers to go on after bending as well. 


While rearranging the workshop to get at wood and make space, the cruiser did some time outside. 


Always enjoy its shape, and it will be used as a reference more as we get closer to completion on the form and closer to building.



Big old pine for strips, full length and selecting knot free stock will make fairing easier.




Lots of clear stock in these boards, relatively few and small knots

 

At 18' long and 18" wide you dont get this at the big box stores!



Full length strips millled.


ready to go on after doublers


Bracing done, next is stripping and fairing, then metal bands.


Before stripping the hull, the plywood stations need to be doubled with solid wood to give the screws something to bite into. Edge grain plywood will just split and screws will pull out as strips are drawn in to the curves


Pine glued and screwed to stations, heading to ends and waiting to be beveled


One end done


Center section doubled both sides, heading to the other end doublers are on the sides closest to the end for beveling, and will not change shape of the hull


Ad from 1911


Looks like we got the shape right, nice fine and hollow entry


Long shot from end back to centre


Form is carried to the ends, for full size cants and to ensure entry is kept fine


Transition from bow to centre with tumblehome kept


Sent for booklet, wonder if it will arrive....