Sunday 27 December 2015

Holiday work

Time off and getting a lot done. Whole week to bring projects up to speed.


New hardware for trailer assembly, local supplier provided Grade 9 hardware to replace the old stuff . Not going to be stranded down old washboard and dirt roads with a broken bolt. $20 got it all.
  

Assembling everything before final paint





Repaint necessary after everything is fit together


Done and all straight



New fenders mounted


Rack mounts bolted in place and will allow removal of racks.


Got some work done on the jointer. Bearings pressed on cutterhead, table blasted clean ready for final assembly and paint


New tapered sheaves, no more keys. Will be perfectly smooth turning around 4000 rpm.


Motor sheave new and matched to cutterhead to provide correct rpm


1hp Leeson motor will provide lots of power


Thursday 24 December 2015

Whole bunch of December stuff

Busy month but still managed to make forward progress on some stuff...



14' mid 50s Peterborough , Model 1814 Mermaid


Trailer hubs rebuilt


Spring and axle assembly on its way to finishing




Wanigan for the homeroom teacher



And one for the shop and resource teacher



Boys in da shop



Solid tips



Fantastic solo boat but a little small for adults..


Doesnt everyone carry around a canoe in December? 


Wow thats small!

Saturday 5 December 2015

More boxes

Dont have any use for burned out old teachers, the kind unions protect while they act like entitled children and dont deliver the education children deserve. Again we've been fortunate to have 2 that are making a tremendous difference in helping our kids reach their full potential. Still time before xmas to make a few boxes, like my oldest asked to do. They even stepped up their contribution in the shop. First a super light all cedar, then a birdseye and black walnut one nearing completion. 


All cedar just after a coat of Tung oil, with ash rails


Plaking is alternating red and white cedar


Gluing up lid of figured maple and black walnut



Sides planed
  

Sides, ribs and planks stacked on the cruiser
   

Lots of dust, and comfortable shoes for a concrete floor. Asics gels in support of breast cancer research


Dust collector barrell full
  

Shaped, ready to mount after oil


Tung oil will prevent water stains during building
  

Nice colour contrast


Ready to build