Tuesday, 1 March 2016

More trailer stuff, gettin closer to done

The quest for a lightweight rail trailer is almost done. No more pulling a heavy duty box trailer for a couple of 70lb canoes. Besides the fuel efficiency, being lightly sprung is easier on the boats. Two tier racks will be removable for winter storage inside, and the upper racks will go to 3 or 4 boats from just the lower ones used for one or two. 
A trip to the Metal Supermarket and its on its way, best part is they cut to length so just put it together and welder up.


Vintage, and light weight


Rack bases bolted with grade 8s, removeable for storage


Gussets for crossbar to upright joint


Sleeved, bolt holes to be drilled


New bumpers for the bigger off road hits



Front rack mock up



Set for lengths from 9' kayaks up to 20'


Time to fire up the Lincoln buzz box


Need to take the sparks outisde, welding inside not the best idea....


Be done in time for the first replica to make its way north


Small areas of rust to be cut out and replaced, where boat winch was located.

Next is mount lights, new wheels and knock down for  paint then reassemble.

Monday, 22 February 2016

Summers coming - random shots to keep inspired while building


Fall shot from Georgian Bay


Gransfors hatchet and Wetterlings Hudson Bay pattern axe


Georgian Bay, best place there is


40s Delta Unisaw, next up for restoration


Very early Chestnut ad describing canoe models


Early shot credited to Thomson in the park


Chestnut Cruiser


57 Chestnut Moonlight currently under construction


Off Lighthouse point, Killbear park Georgian Bay. 17' Chestnut Cronje


17' Tremblay v stern, vintage 4hp merc. Took huge loads on fishing and hunting trips, sadly sold years ago.

Jointer done and working

Ah, satisfaction. One vintage machine rebuilt and running, 2 more to go. Next up is the late 40s Unisaw, followed by a late 50s General Bandsaw. Old iron really is the best, compared to the plastic and aluminum built today. 


Hubbel, American made 220v components. Eded up with a different switch with lockout, but used the rest including new wiring. 


Square D box with lockout. 1hp Leeson motor converted to 220v, drawing only 8 amps rather than 12 at 110v.


Taper sheaves, and v belt. At over $50, pieced belt wasnt used - for $8.99, a new vbelt is fine.


Done, first pass with new blades. No problems


Final paint touch ups, and its done. 


Ready for squaring up stock for thwarts, seats and whatever else needs truing up before the planer. 


General 4", 1/3 hp sold. Not used and too small for our work, but a great piece nonetheless as its built in Drummondville Que, and not an offshore piece.

Next is finishing the cruiser form, and a try at getting a boat off and in the water for mid July,  if not later in the summer. 

Not bad for starting with an ex -factory piece with a crappy jet pump motor cobbled together


Huge industrial power switch, now long gone. 

Sunday, 17 January 2016

Jointer project


Almost ready, and really need it done. All painted and going back together with this.


Been looking forward to trying out Boeshield, a rust inhibitor developed by Boeing for use on metal aircraft parts. Not only a water displacer, it leaves a film that doesnt fill up with dust and debris.


Main body on stand


Adjusters and fence lock. Adjusters thread through bronze carriers.



All parts lubed up. 



Cutterhead with new bearings in carriers ,  and outfeed table. 


Outfeed table with adjuster sleeved back in and carrier ready to bolt to main body


Cutterhead cap and fence end. 



 Back together, ready to mount on table and connect to motor.



Finally done



Sleeved pulleys rather than keyed for better balance, matched for 3800 rpm with a 1hp motor turning at 1750 rpm.


Motor in place, to be wired to a new switch box


Last piece to be painted, guard top. 




 Link belt from Lee Valley will be used , as they are supposed to run cooler and quieter. If they run well, all machines will get it. 

Next shots will be up and running and testing with lumber.




Sunday, 27 December 2015

Holiday work

Time off and getting a lot done. Whole week to bring projects up to speed.


New hardware for trailer assembly, local supplier provided Grade 9 hardware to replace the old stuff . Not going to be stranded down old washboard and dirt roads with a broken bolt. $20 got it all.
  

Assembling everything before final paint





Repaint necessary after everything is fit together


Done and all straight



New fenders mounted


Rack mounts bolted in place and will allow removal of racks.


Got some work done on the jointer. Bearings pressed on cutterhead, table blasted clean ready for final assembly and paint


New tapered sheaves, no more keys. Will be perfectly smooth turning around 4000 rpm.


Motor sheave new and matched to cutterhead to provide correct rpm


1hp Leeson motor will provide lots of power